City of Chicago – Department of Water
This system consisted of implementing a plant wide SCADA system where none existed before. New AB PLC’s throughout plant linked via fiber optic redundant networking. Large screen data center with matrix switching of video and sound.
- Over 10,000 Data Points
- Allen Bradley PLC’s
- Intellution iFIX redundant SCADA software, 3 Total SCADA Nodes, 12 View Nodes
- Complete System / panel and software design.

Comments on this entry are closed.