Greater Peoria Sanitary District Wastewater Plant and Wastewater Collection System
Owner - Greater Peoria Sanitary District - 2322 South Darst Street, Peoria, IL 61607
View | Hide
- Project Timeframe - March, 1998 to present
- Last project completed 12/06
- Over 3500 Data Points
- Allen Bradley PLC's
- Motorola licensed radio
- Intellution iFIX redundant SCADA software
- Complete system / panel and software design
- This system consisted of replacing an old plant wide SCADA system and remote telemetry system with an Allen Bradley PLC based system, using Intellution software. The plant system consists of 8 PLC systems; the remotes consist of 16 RTU's communicating with Motorola radios. The computer network has two SCADA computers and 11 view node computers. System has recently been upgraded with latest software, new computers, and additional PLC systems, along with new fiber optic communications
City of Appleton, WI Wastewater and Water Utilities
Owner - City of Appleton, Utility Department, 100 N. Appleton Street, Appleton, WI 54911
View | Hide
- Project Timeframe - May, 1999 to present
- Last project completed 12/06
- Over 7300 Data Points - Wastewater, over 2000 points in the water system
- Square D, Modicon and Allen Bradley PLC's
- Motorola licensed radio's and Metricom Spread Spectrum radio's
- Intellution iFIX redundant SCADA software at both plants
- Complete System and Panel design, telemetry design and software configuration. Allan Engineering Co. Inc. prepared the plans and specifications for the public bid of the hardware on the water plant project
- The project at the Wastewater Plant involved replacing a UNIX SCADA system with a redundant Intellution SCADA system using Square D & Modicon PLC's. The Water Plant is a new facility where we are designed and implemented a central redundant SCADA system using iFIX and Allen Bradley Controllogix PLC's. There are 8 remote stations on the wastewater system using Motorola MOSCAD radios/RTU's. The water system has 7 remotes using Allen Bradley PLC's and Utilinet spread spectrum radios. Main High Lift pump are being monitored and controlled at the water plant
City of Chicago - Department of Water - Jardine Water Purification Plant Central SCADA System, CL2/Fluoride Control System
Owner - City of Chicago Water Department - 1000 East Ohio Street, Chicago, IL 60611

View | Hide
- Project Timeframe - May, 1999 to March, 2003
- Last project completed 03/03, ongoing maintenance contract
- Over 18,000 Data Points
- Allen Bradley PLC's, Square D Sy/Max, F&P Controllers, Johnson Controls Metasys, ODBC Data Servers
- Intellution iFIX redundant SCADA software, 5 Total SCADA Nodes, 23 View Nodes
- Complete system / panel and software design
- This system consisted of replacing an old DEC VAX Control System with a new Intellution Central SCADA System. New Allen Bradley PLC's were used. The system also communicated to an existing Square D Sy/Max PLC system. Other plant systems were linked in to provide a complete Central SCADA system for the Worlds largest water filtration plant. Communications throughout plant is via Cat-5e and fiber optic cables to form a redundant network
Village of Wilmette, IL Water Treatment Plant SCADA System
Owner - Village of Wilmette, 100 East Lake Drive, Wilmette, IL
View | Hide
- Project Timeframe, Multiple Projects - May 1992 to Present
- Last project completed 12/05, ongoing maintenance contract
- Modicon Quantum and Square D Sy/MAX PLC's
- Intellution iFIX v. 3.5 w/ iHistorian
- Plant wide central SCADA system
- Over 3500 data points
- Complete chemical feed systems integration
- Complete chemical feed systems integration
- Filter bed automation with pump control
- Phone line communications to remote reservoirs/pump stations
Village of Arlington Heights Water System SCADA Project
Owner - Village of Arlington Heights, 222 N. Ridge Avenue, Arlington Heights, IL 60005
View | Hide
- Project Timeframe - March, 2004 to July, 2006
- Last project completed 07/06
- Over 3000 Data Points
- Allen Bradley PLC's
- MDS licensed radio
- Intellution iFIX redundant SCADA software
- Complete system / panel and software design.
- Complete chemical feed systems integration
- This system consisted of replacing an old phone line based telemetry system with a new centralized SCADA system. There are 26 remote PLC's, one master PLC. There are two SCADA nodes, and 18 view nodes
Dupage County Flood Control SCADA System
Owner - Dupage County, IL Stormwater Management Division - 421 N. County Farm Road, Wheaton, IL 60187
View | Hide
- Project Timeframe - February 1992 to Present Enhancements and new stations are being added on an on-going basis
- Last project completed 03/05, ongoing maintenance contract
- Over 2000 Data Points
- Modicon PLC's
- MDS Spread Spectrum Radio's
- Intellution FIX-32 SCADA software
- Complete system / panel and software design. Allan-ICS has written specifications and completed contract drawings for URS Greiner Woodward Clyde, and for Christopher B. Burke Engineering, for public bid on projects as part of this system
- Project is a flood control SCADA system consisting of over 50 Modicon RTU's spread throughout the County, communicating via spread spectrum radio to 4 Master PLC locations which communicate to one central PLC at the County Grounds using Ethernet over T1 lines. The central PLC location then has an Intellution FIX system with WEB support for HMI functions. There are two large pump stations that pump water out of the Elmhurst Quarry back into Salt Creek. The PLC controls the automatic operation of these pumps
City of Chicago - Department of Water - South Water Purification Plant Central SCADA System
Owner - City of Chicago Water Department - 1000 East Ohio Street, Chicago, IL 60611
View | Hide
- Project Timeframe - May, 2004 to December 2006
- Project completed 12/06, ongoing maintenance contract
- Over 10,000 Data Points
- Allen Bradley PLC's
- Intellution iFIX redundant SCADA software, 3 Total SCADA Nodes, 12 View Nodes
- Complete system / panel and software design
- This system consisted of implementing a plant wide SCADA system where none existed before. New AB PLC's throughout plant linked via fiber optic redundant networking. Large screen data center with matrix switching of video and sound
City of Highland Park, IL Water Plant SCADA System
Owner - City of Highland Park, IL - 100 East Park Ave, Highland Park, IL 60035
View | Hide
- Project Timeframe - March, 2000 to July 2002
- Project completed in July, 2002
- Over 1800 Data Points
- Allen Bradley PLC's - Ethernet, SLC and ControlLogix
- Data linc leased line telemetry
- Intellution iFIX redundant SCADA software
- Complete system / panel and software design
- This system consisted of replacing an old Bristol Babcock plant wide SCADA system and remote telemetry system with an Allen Bradley PLC based system, using Intellution software. The plant system consists of 12 PLC systems; the remotes consist of 6 RTU's communicating with data-linc leased line modems.. The computer network has two SCADA computers and 10 view node computers
City of Oak Creek Water Plant and Backup Well
Owner - City of Oak Creek, WI, 9325 S. 5th Ave, Oak Creek, WI 53154
View | Hide
- Project Timeframe - November 1999 to September 2002
- Allen Bradley PLC's
- Rockwell Software RS-VIEW SCADA software
- Over 100 data points
- Complete control panel design including filter consoles
- Remote telemetry to Well house along with well house control using A-B PLC
- Phone line communications
M.W.R.D.G.C., Stickney Water Reclamation Plant - PLC / SCADA System Maintenance
Owner - M.W.R.D.G.C., Stickney WRP, 6001 W. Pershing Road, Cicero, IL 60804
View | Hide
- Project Timeframe - July 2001 to Present
- Allen Bradley PLC's, GE 90/70 PLC's
- Intellution FIX-32 iFIX software, GE Cimplicity, RS-VIEW
- We have an M&O contract with Stickney WRP to maintain / upgrade various PLC/SCADA systems at the Plant. We have completed upgrades to various systems including the main sewage pumps running on GE/FANUC 90/70 PLC's, and a large PLC/HMI system on the Plant's centrifuges. We also installed new AB PLC based control panels on two large pumps, over 10,000.00 HP at the mainstream pumping station
© Copyright 2007 Alan Integrated Control Systems, Incorporated. All rights reserved.
2021 Beulah Avenue, PO Box 888, East Troy, WI 53120
phone: (262) 642-7800 • fax: (262) 642-7870 • info@allan-ics.com
|
|
ALLAN-ICS
DELIVERS:
• In-plant SCADA Systems
• Remote Telemetry Systems using both radio and phone telemetry
• Pump Control Systems
• Blower Control Systems
• Variable Frequency Drive systems
• Power Monitoring Systems
|