Integrated Control Systems
since 1970.

Arlington Heights Water System SCADA Project

by Wendy Solum on 2010/04/23

Allan-ICS Client Project - Arlington Heights Control Room

Village of Arlington Heights, IL

This system consisted of replacing an old phone line based telemetry system with a new centralized SCADA system. There are 26 remote PLC’s, one master PLC. There are two SCADA nodes, and 18 view nodes.

  • Over 3000 Data Points
  • Allen Bradley PLC’s
  • MDS licensed radio
  • Intellution iFIX redundant SCADA software
  • Complete system / panel and software design.
  • Complete chemical feed systems integration

Comments on this entry are closed.

Previous post:

Next post: